Commissioning · Chemical & Process Plants

Engineering Excellence.
From Completion to Operation.

More than 20 years in the chemical industry and plant engineering. I take your plant from mechanical completion to safe, stable operation – in Germany and internationally.

Turnover ManagementPre-CommissioningCommissioningStart-up

Ways of working together

Every service as delivery, consulting or training

Whether I take on a complete work package, advise your team or train your staff – all services are available in the format that suits your project.

01

Project delivery

I take on planning, coordination and documentation – for a single work package or the entire commissioning.

  • As part of your project team
  • On site
  • Continuous reporting to project management
02

Advisory & consulting

I support your team where concepts, strategies or an experienced second opinion are needed.

  • Concepts for turnover, test packages, flushing and labelling
  • Reviews of existing plans and procedures
  • Selection and introduction of completion tools
03

Training & workshops

I give your project or operations team the know-how to manage commissioning confidently themselves.

  • Turnover management and mechanical completion
  • Punch list management and system handover
  • Tailored to your project and your standards

Turnover Management

A common thread through every project phase

Turnover management does not start at handover. Set up during engineering and carried consistently through construction, it lets you hand over system by system later on – traceable and without surprises. This has been my focus on large international projects since 2018.

Example: handover system by system Utilities first, process systems in start-up sequence
0 of 8 systems handed over to operations
System Constr. MC RFC RFSU Handover
S-10 Cooling water
S-20 Instrument air
S-30 Nitrogen
S-40 Steam & condensate
S-50 Feedstocks
S-60 Reaction
S-70 Distillation
S-80 Off-gas treatment
MC = Mechanical Completion · RFC = Ready for Commissioning · RFSU = Ready for Start-up
  1. 01

    Engineering

    • Systemisation of the plant
    • Define completion and handover requirements
    • Define check sheets and documentation structure
    • Derive turnover strategy from the start-up sequence
  2. 02

    Construction

    • Progress tracked by system, not just by area
    • Continuous capture of test records
    • Walk-downs and punch lists
    • Digital completion management
  3. 03

    Pre-Commissioning

    • Mechanical completion per system
    • Ready for commissioning
    • Management of outstanding items
  4. 04

    Commissioning & Start-up

    • Staged system handovers
    • Clearing open items by priority
    • Ready for start-up
  5. 05

    Handover to operations

    • Complete turnover packages
    • Documentation for operations and maintenance
    • Close-out of remaining items

Services in detail

Planning and coordination – from test packages to nameplates

I prepare, manage and document the work between the end of construction and commissioning that decides on schedule and quality.

A

Pressure testing & test packages

I split piping systems into sensible test packages and coordinate pressure tests from preparation to release.

  • Test package definition based on P&IDs and isometrics
  • Test pressure, test medium and holding times according to applicable codes
  • Test package documents: mark-ups, test procedures, blind and spade lists
  • Alignment with construction, owner and inspection bodies
  • Test supervision, records and punch item tracking
  • Coordination of reinstatement after testing

Result: fully tested and documented piping systems.

More on pressure testing
B

Flushing & cleaning

Clean systems are the basis for a trouble-free start. I plan the right cleaning method for each system.

  • Flushing concepts and flushing circuits
  • Method selection: water flushing, air or steam blowing, oil flushing, pickling and passivation
  • Protection of sensitive components: removal of valves and instruments, start-up strainers
  • Cleanliness criteria and acceptance methods
  • Coordination of specialist contractors

Result: demonstrably clean systems, ready for commissioning.

More on flushing & cleaning
C

Leak testing

After reinstatement I make sure every joint is tight before process media enter the plant.

  • Medium-neutral leak test planning – test medium chosen per system
  • Testing of flanged joints and reinstatement points
  • Pressure hold tests, sniffer and leak detection methods
  • Documentation and release of systems for commissioning

Result: a tight plant, a safe start, no surprises during start-up.

More on leak testing
D

Plant labelling

Complete and unambiguous labelling is mandatory for safe operation. I plan and manage it end to end.

  • Labelling concept according to site standard or plant identification system
  • Pipe marking with medium and flow direction
  • Tags for vessels, machinery, valves and instruments
  • Quantity take-off, procurement and installation coordination
  • Verification against P&IDs and site acceptance

Result: a clearly labelled plant, ready for handover to operations.

More on plant labelling

Process

How we work together

Clear steps, transparent communication and measurable results.

Enquiry & analysis

Together we clarify scope, schedule and requirements of your project.

Planning

Commissioning concept, test plans and resource planning.

Execution on site

Execution, coordination of trades and continuous reporting.

Handover

Acceptance, complete documentation and handover to operations.

About

Portrait of Tobias Lenke

Tobias Lenke

Industrial Engineer (B.Sc.) · Founder

I know plants from every angle: starting out as a chemical operator in production, I was responsible as commissioning manager for the commissioning of a world-scale nitric acid plant and then looked after plants across their entire life cycle as process and asset manager.

Since 2018 I have been planning and managing plant handovers and commissioning as turnover manager on large international projects in the chemical industry – leading teams of up to 50 people, contractors and package unit vendors, including budget and schedule responsibility.

My aim: your plant runs – on time, safely and documented so that your operating team can work with it from day one.

20+ yearsChemical industry & plant engineering
up to 50People led in one team
EN · DE · NLProject languages

Career

From production to project management

Hands-on experience from every phase of a plant's life – the basis for smooth commissioning.

  1. since 2018

    Turnover Manager · Plant handover & commissioning

    Management of the entire turnover process on large international projects, deputy team lead, introduction of digital completion management tools.

  2. 2016 – 2018

    Asset Manager

    Life-cycle asset strategies, risk assessment, CAPEX/OPEX planning, compliance with German plant safety, water and emission regulations and explosion protection.

  3. 2014 – 2016

    Process Manager

    Process analysis and optimisation, KPI monitoring, digitalisation and automation initiatives.

  4. 2012 – 2014

    Commissioning Manager

    Overall responsibility for commissioning a world-scale nitric acid plant, leading a team of up to 20 people.

  5. 2003 – 2012

    Chemical Operator

    Operating and controlling production plants, deputy shift supervisor. In parallel: B.Sc. Industrial Engineering, Mannheim University of Applied Sciences (2013).

Prometheus Co-consoleAutodesk Construction CloudNavisworks SimulateUniversal Plant ViewerP&IDs & function diagramsMS Office

Contact

Let's talk about your project

Planning a commissioning or need support on site? Get in touch – I usually reply within one working day.

Request a project

Send me a short note – plant, time frame and location are enough to start with.

"Save contact" adds name, phone number and email straight to your phone's address book.

Questions first? See the FAQ.